Project and Engineering

Projects Undertaken 

SBG Plaza

Project SBG plaza
Location Muscat, Oman
Date of Completion 2012
Size 3700 Ton

Equipment Selection

Classification

Type

Q’ty / HP

ODU

VRF/DUCTED

230 EA

IDU

Duct, 4wayCST

606 EA

Control

Wired remote controller, PIM

 


Office 1991

Project Office 1991
Location OFFICE 1991, AL GHUBRA
Date of Completion Ongoing
Size 2300 Ton

PDO Taif Building

Project PDO VILLA & APP’MENTS
Location RAS AL HAMRA,OMAN
Date of Completion Ongoing
Size 950 Ton

Equipment Selection

Classification

Type

Q’ty / HP

ODU

VRF/PACU/AHU

22 EA

IDU

Duct, 4wayCST

85 EA

Control

Wired remote controller,

 


Duqm Port

Project Office Building
Location Duqm, Oman
Date of Completion 2011
Size 280 Ton

City Park Hotel

Project 3 STAR HOTEL
Location Muscat, Oman
Date of Completion 2017
Size 780 Ton

Equipment Selection

Classification

Type

Q’ty / HP

ODU

VRF/PACU

66 EA

IDU

Duct, 4wayCST

240 EA

Control

Wired remote controller, MIM –B14

 

Buraimi Sports

Project SPORTS COMPEX
Location Muscat, Oman
Date of Completion 2013
Size 750 Ton

Equipment Selection

Classification

Type

Q’ty / HP

ODU

VRF, PACU&AHU

50 EA

IDU

Duct, 4wayCST

226 EA

Control

Wired remote controller,

 

NMC Hospital

Project HOSPITAL
Location Al Ghubra, Oman
Date of Completion Ongoing
Size 220 Ton

Equipment Selection

Classification

Type

Q’ty / HP

ODU

DVM

26 EA

IDU

360 CST,HI WALL

180 EA

Control

Simplified  remote Controller

 

Indian School

Project INDIAN SCHOOL AWABI
Location Awabi, Oman
Date of Completion Ongoing
Size 680 Ton

Equipment Selection

Classification

Type

Q’ty / HP

ODU

DVM

16 EA

IDU

BORACAY

102 EA

Control

Simplified  remote Controller

 

Dahlia Qurum

Project DAHLIA
Location Muscat, Oman
Date of Completion 2017
Size 655 ton

Equipment Selection

Classification

Type

Q’ty / HP

CAC

Ducted Split

320 EA

Control

Wired remote controller

 

New Muscat Airport

Project FLIGHT CONNECTION BRIDGE
Location SEEB,OMAN
Date of Completion Ongoing
Size 56 HP

Equipment Selection

Classification

Type

Q’ty / HP

ODU

VRF (DESERT)

6 EA

IDU

WALL MOUNT/DUCT

24 EA

Control

ADVANCED CENTRAL CONTROLER/ WIRED REMOTE

 

Fahmy Furniture

Project FAHMY BUILDING
Location Muscat, Oman
Date of Completion 2014
Size 300 ton

Equipment Selection

Classification

Type

Q’ty / HP

CAC

Ducted & WM Split

320 EA

Control

Wired remote controller

 







Project and Engineering Division (PED) specializes in the installation and maintenance of customized high-capacity Samsung HVAC solutions for high profile commercial and residential environments.

PED also offers the innovative Italian kitchen appliances brand, Candy. The brand blends high-performance, Euro design, energy efficiency and eco-conscious operation for the most discriminating clientele.

PED solutions include products with the highest quality and safety features, as well as prompt and fully reliable after-sales support.


Samsung HVAC System

We provide the safe and healthy way to control the temperature and humidity in closed building environments as varied as office complexes, hotels and sports stadiums.

Candy Built-in Appliances

With sleek European design and advanced features, Candy offers standalone and built-in kitchen appliances that perfectly complement the most luxurious living spaces.